Determination of deformation and installation into design position of rotary kilns #2 and #3
Azovstal, October 2016

Objective: technical audit of rotary kilns #2 and #3 without their shutdown.
To make the optimal corrective action of their position to installation into design position
SITE: AZOVSTEEL, OCTOBER 2016
To prepare for work. To study the site


To bring back several point of geodetic network for measurement, which was destroyed


Sensor checks the changes in speed of rotation kiln. All equipment are synchronized for make the corrective in measurements.


The measure of kiln and their on line control



THE RESULT OF OUR WORK
Kiln position in horizontal plane

Kiln position in vertical plane


Determination of the actual parameters of the central angle
Longitudinal and cross profile of a roller.


Longitudinal and cross profile of a roller.